ADU electrical cost factors are the site details that change a quote before any wire is pulled. The path across the yard, the meter choice, and the loads in the cottage can add more to the job than the panel itself.

Call (503) 780-6207 and we will look at the utility path, the meter location, and the loads before we talk price. Or request a quote.

For ADU electrical cost factors, there is no reliable single price without a site review. Cost depends on the cottage load, overhead or underground routing, distance to the house or the utility line, meter location, utility charges, trenching, conduit, vaults, easements, permits, and inspections. A licensed electrical contractor can name those factors and give a clearer estimate.

For an Oregon ADU, planning starts with the unit's loads and with whether the house can spare that load. NFPA explains that home size and equipment loads affect the needed connection size. Portland General Electric notes that site information and an approved job sketch may be needed before work begins. Knowing what is included helps separate the electrical work from utility and site costs.

What powering an ADU includes

Code, permits, and the choice between a subpanel and a separate meter are covered in our ADU electrical requirements guide. This article stays on cost.

Power for a new cottage starts at the house panel or at the utility line. The job may include the overhead or underground conductors, conduit, the meter, grounding, and the first disconnect. From there, conductors continue into the cottage panel, where power is split to branch circuits.

The utility confirms whether the connection will be overhead or underground, and whether the proposed meter location works. That choice can change the route, trenching, conduit, easements, and other site work. Those details have to be set before anyone can say what the ADU electrical cost factors will do to the number.

Home size and equipment loads also set how large the connection needs to be. A studio with lights and a kitchenette is not the same job as an ADU with a heat pump, a range, or a patio heater. Pro Tech Power handles residential electrical work for homes and commercial buildings along the I-5 corridor from Portland through Eugene. We are licensed under Oregon CCB#198878.

What this work does not include

A first connection is different from a panel swap in a house that already has power. A panel swap replaces equipment on an energized property. It does not always include a new utility connection, a new meter location, or a new route across the yard.

It is also different from interior wiring. Interior wiring runs through rooms, lighting, receptacles, and dedicated circuits after power reaches the cottage panel. Those circuits may be part of the same build, but they are separate from the outside path, the meter, and the first disconnect. For the gear at that point in the system, see meter-main panel installation planning.

Because utility rules, site conditions, equipment loads, and permits vary, a new connection should be designed around the actual lot. A package price from a similar cottage on a different street is not a quote.

ADU electrical cost factors to check first

There is no single answer to what changes ADU electrical cost. The job may be a short feeder near the house, or a long run across a custom lot. Distance, access, and the utility's design all change the scope before work starts.

The route is one of the first decisions. Overhead conductors may work where utility lines and a suitable attachment point are nearby. Underground work can add trenching, conduit, a vault, restoration, and inspections. PGE requires an inspection of the trench and vault before underground work is backfilled. The customer is responsible for conduit and vault costs, including installation. Right-of-way excavation must be done by a PGE-approved contractor. See the PGE residential construction FAQ for those requirements.

How overhead and underground paths can change project scope
FactorOverheadUnderground
Typical pathConductors run from existing utility lines to an approved attachment point.Conductors run through a prepared underground route to the meter or equipment.
Who handles trench and conduitUsually no project trench. The utility and electrical team coordinate the approved connection.The customer is responsible for conduit, vaults, and their installation. Right-of-way work needs an approved contractor.
Inspection before backfillNot applicable to an underground trench.The trench and vault must be inspected before backfill.
When it tends to cost moreLong distances, difficult attachment points, or utility changes can increase the scope.Long runs, hard soil, road crossings, trenching, conduit, vaults, and restoration can increase the scope.
Common onSites near established overhead utility lines.New subdivisions, sites with underground utilities, and lots where overhead routing is not suitable.

Load matters too. A commercial build may need different planning from a single-family home, and single-phase and three-phase power are not interchangeable. Meter location, panel location, conduit size, vaults, easements, permits, and utility line-extension rules can each change the work. If utility equipment must sit on third-party property, PGE requires an easement, and the customer pays the related costs. A custom home on a large parcel usually needs an earlier utility conversation than a home in a planned development. NFPA covers these planning points in its 2020 NEC overview.

Pro Tech Power designs new power connections for residential new construction and commercial builds. We coordinate the electrical scope for projects in Portland, Tigard, Wilsonville, Woodburn, Salem, Albany, and Eugene.

How the utility bill and the contractor bill split

When you ask what changes ADU electrical cost, you are usually looking at two bills, not one. The utility connects you to its system. We install the equipment on your property. Keeping those bills separate makes the estimate easier to read. A utility charge is not the same thing as the installation cost.

The utility scope

The utility side may include the application, site rendering, job sketch, design work, line extension or connection charges, easements, and equipment the utility owns. Portland General Electric says the process begins after it receives the project documents and the site's needs. The timeline is specific to the site, so an estimate cannot be reliable until the utility has that information.

If utility equipment must cross or sit on third-party property, an easement may also be required, and the customer pays the related costs. Before utility construction begins, an approved job sketch and a pre-construction meeting are required. Underground work can also require a trench and vault inspection before backfilling. Trenching, conduit, vaults, road crossings, and right-of-way work should be named in the estimate, not treated as an afterthought.

The contractor scope

Our scope generally covers the meter equipment, entrance conductors, disconnect, grounding, panel, permits, and coordination through inspection. The final equipment depends on the calculated load, the meter location, utility requirements, and the home's design. A new dwelling connection can also require code items that add equipment to the estimate.

Under the 2020 NEC, Section 230.85 requires an outdoor emergency disconnect for new one- and two-family dwelling connections, marked as an emergency disconnect. Section 230.67 requires a Type 1 or Type 2 surge protective device at the main equipment. NFPA's 2020 NEC overview explains these requirements. These items should appear in the estimate, not first surface during inspection.

Pro Tech Power Corp is Oregon CCB#198878, and we handle permits and inspections as part of the project. If you already have power and only need a larger panel, see our guide to a 200 amp upgrade. For a new connection, request a quote so the utility and contractor scopes can be discussed together before anyone invents a price.

What else changes ADU electrical cost factors

Most ADUs start with a choice, not a price. A subpanel fed from the house is usually the smaller project when the house already has room for the extra load. A separate meter is a new utility account. It adds an application, a meter, and often a longer path across the yard. That choice is one of the ADU electrical cost factors that moves the bill the most.

The live guide on ADU electrical requirements walks through how to make that choice. Cost follows the choice. A subpanel still needs a feeder, a disconnect, and a clear route from the house. A separate meter can add trench, conduit, a vault, and an easement if the path crosses another property.

Load changes the gear either way. A small studio is not the same as an ADU with a heat pump, a range, or a patio heater. NFPA notes that home size and equipment loads set the connection size. That is why a square-footage guess is not a quote.

We install ADU power as part of residential new construction, remodels, panel work, Kohler and Cummins generator installation, and patio heaters. Interior circuits inside the ADU are a different scope from the feeder or the new meter. If the main house is being built at the same time, new-home electrical wiring covers that interior work.

Distance from the house panel, overhead versus underground, and whether the utility has to set a new meter are why no single number answers the question. We review sites in Portland, Tigard, Wilsonville, Woodburn, Salem, Albany, and Eugene before we outline the work.

What to bring before you ask for a number

A useful quote starts with the site, not a guess from a similar project. Bring what you already know, and say so when a detail is still open. Missing information is normal early in design. Hidden information is what blows up a number later.

  1. Address and distance to existing lines. Note how far the cottage sits from the house panel or the nearest utility lines, and whether the path is open or blocked by trees, a driveway, or a slope. A short run beside the house is a different project from a long run across a large lot.
  2. Overhead or underground preference. If the utility has already said which one is allowed, bring that note. If you only have a preference, say that too. Underground work adds trench, conduit, and a vault inspection before anyone backfills.
  3. Building type and size. A cottage, an addition, and a commercial building do not use the same gear. Square footage helps, and so does whether this is new construction or a building that already has power.
  4. Planned major loads. List the heat pump, range, patio heater, or other equipment you expect. Those loads set the size of the connection. A panel that is only large enough for today's appliances leaves no room for the next one.
  5. Preferred meter location. Mark where you want the meter, and where you do not. The utility has to accept the spot. A meter on the far side of the building can add conductor and conduit you did not budget.
  6. Neighbor or right-of-way crossings. If the path crosses another property or a public right-of-way, an easement or an approved excavator may be required. Portland General Electric requires an easement when its equipment sits on third-party property, and the customer pays the related costs.
  7. Target date and the general contractor. Utility design does not start until the paperwork is in. A date without a site plan does not hold a crew. If a builder is running the job, name them so the electrical scope can sit inside their schedule.

If you are adding onto a house that already has power, start with electrical planning for a home addition instead of assuming you need a brand-new utility connection. Readers who already have power and want a larger system can use our home electrical system upgrade guide.

Our office is at 9386 SW Tigard St., Tigard, OR 97223. Pro Tech Power is COBID certified OSBE #13068 and Oregon CCB#198878. We work with owners and builders in Portland, Tigard, Wilsonville, Woodburn, Salem, Albany, and Eugene, and we are not limited to Tigard.

Frequently asked questions

Why is there no single ADU electrical price?

The route, the building load, and the utility's rules are different on every lot. A short overhead connection beside an existing line is not the same project as a long underground run that needs conduit, a vault, and an easement. Anyone who quotes one number before seeing the site is guessing.

Does underground cost more than overhead?

It often does, because underground work adds trenching, conduit, vaults, restoration, and an inspection before backfill. Overhead can still grow when the run is long or the attachment point is hard to reach. The utility, not the homeowner, decides which route is allowed.

Who pays for conduit and trenching?

On a Portland General Electric residential project, the customer is responsible for conduit and vault costs, including installation. Right-of-way excavation has to be done by a contractor the utility approves. Those costs sit next to the electrical installation, not inside a single labor line.

How is ADU power different from a panel upgrade?

A panel upgrade replaces equipment on a property that already has power. A new connection brings power to a building that does not have it yet, which can include the utility application, the meter, the first disconnect, and the path across the property. If you already have power and only need more capacity, a panel upgrade is the closer question.

What should I bring to the estimate?

Bring the address, the distance to existing lines, the building type and size, the major appliances or equipment you plan to add, and any note from the utility about overhead or underground. A preferred meter location and the name of the general contractor help too. We can review the site before anyone names a price.

Get an ADU electrical estimate

Call (503) 780-6207 so we can review the site, the meter choice, and the ADU loads before anyone names a price. Or request a quote.

Get Started

Let’s Get Started

Proudly serving our clients with excellence since 2013. We'd love to learn about your needs to see how our services can be of assistance.

Service Area

Serving Oregon's I-5 Corridor

Pro Tech Power serves homes and businesses throughout the Willamette Valley, from the Portland metro area south to Eugene.

  • Portland, OR
  • Tigard, OR
  • Wilsonville, OR
  • Woodburn, OR
  • Salem, OR
  • Albany, OR
  • Eugene, OR

Pro Tech Power uses cookies for analytics and advertising, to improve this site and measure our ads. See our privacy policy.