Pro Tech Power logo

A SINGLE SOURCE ELECTRICAL SOLUTION

Generator Sales & Installation

Stay prepared for outages with professionally installed generators for performance, efficiency, and long-term reliability.

Kohler standby generator installed beside a landscaped home

Overview

Complete Generator Sales & Installation Solutions

We work closely with Cummins Onan to provide you with the most efficient, reliable, and cost-effective home generator solutions available on the market. Whether you're a homeowner looking for whole-house backup power or a business that can't afford downtime, our licensed electricians handle the full installation process — from load assessment and permitting to switch-gear wiring and permitting.

Full home systems typically range from $15,000–$22,000 and are a smart, lasting investment for Oregon properties with farms, acreage, or mission-critical power needs.

Residential standby generator installed on a wooded property

BENEFITS

Why Choose Our Generator Solutions

Built for reliability, installed with precision, and tailored to your exact power needs.

Custom-Tailored Systems

Every system is designed based on your property's actual power requirements for maximum efficiency.

Top-Tier Equipment

We install trusted generator systems from Cummins Onan, known for durability and performance.

Licensed, End-to-End Installation

Our electricians manage everything — from permits to final inspection — for a hassle-free experience.

Reliable Backup Power

Stay powered during outages with systems you can depend on when it matters most.

Detailed generator electrical and mechanical installation

Our Process

A Seamless, Start-to-Finish Installation

Our proven process ensures your generator system is installed safely, efficiently, and correctly the first time.

  1. 1

    Load Assessment & Consultation

    We evaluate your energy usage to determine the ideal system size.

  2. 2

    System Design & Equipment Selection

    We recommend the best generator solution for your needs and budget.

  3. 3

    Permitting & Preparation

    We handle all required permits and compliance requirements.

  4. 4

    Professional Installation

    Safe, code-compliant installation of the generator and transfer switch.

  5. 5

    Testing & Final Inspection

    We ensure everything runs flawlessly before completion.

USE CASES

Designed for Homes, Businesses & Beyond

Our generator solutions are built to support a wide range of properties and power needs.

Homeowners

Whole-home backup power for uninterrupted comfort and safety.

Businesses

Prevent downtime and protect operations during outages.

Farms & Acreage

Keep essential systems running without disruption.

Critical Operations

Ideal for environments where power loss is not an option.

Commercial Kohler standby generator ready for installation
Commercial electrical service and transfer equipment

Advantages

The Value of Backup Power

Investing in a generator system provides immediate reliability and long-term peace of mind.

  • Continuous power during outages
  • Protection for appliances and critical systems
  • Increased property value
  • Peace of mind during extreme weather
  • Reduced risk of operational downtime

LOCATION

Serving the I-5 Corridor in Oregon

Providing reliable services across key cities and surrounding areas in Oregon.

Portland
Tigard
Wilsonville
Woodburn
Salem
Albany
Eugene

INSTALLED SYSTEMS

Backup Power, Built for the Property

A broader look at residential and commercial generator planning, delivery, installation, and completed systems.

Dual standby generators with finished gas piping
Cummins generator installation close-up
Kohler generator beside a stone wall
Commercial Kohler standby generator installation
Generator project plans under review
Generator electrical installation in progress
Commercial facility supported by standby power
Standby generator integrated with landscaping
Generator engine installation detail
Generator delivery for installation
Neighborhood backup power project area
Commercial Cummins generator
Commercial property protected by backup power during a storm
1 / 10

Get Started

Let’s Get Started

Proudly serving our clients with excellence since 2013. We'd love to learn about your needs to see how our services can be of assistance.

Service Area

Serving Oregon's I-5 Corridor

Pro Tech Power serves homes and businesses throughout the Willamette Valley, from the Portland metro area south to Eugene.

  • Portland, OR
  • Tigard, OR
  • Wilsonville, OR
  • Woodburn, OR
  • Salem, OR
  • Albany, OR
  • Eugene, OR

Pro Tech Power uses cookies for analytics and advertising, to improve this site and measure our ads. See our privacy policy.